Interclima 2026: Panasonic showcases our Lille co-ownership project

By Kévin Hecker Interclima 2026 and Panasonic case study

At the Interclima trade show in Paris, we were on Panasonic’s stand; Panasonic then published a case study on our project: a 134 kW oil boiler replaced by two 30 kW heat pumps in a 19-studio building in Lille.

In late September 2026 we were in Paris, on Panasonic’s stand at the Interclima trade show. The trade magazine L’Installateur photographed our team with Thierry Ronat, Country Manager France of Panasonic Heating & Cooling, in front of the Big Aquarea T-CAP M Series, the heat pump model we installed in a Lille co-ownership building.

Panasonic then published a case study on this project. Here is what the show is, what Panasonic presented there, and the project in detail, with the figures published by the manufacturer.

What is Interclima?

Interclima is a professional trade show held in Paris, dedicated to building services: everything used to heat, cool and ventilate a building and to produce its hot water. Manufacturers present new products to installers, engineering firms and building owners.

For an installer, it is a chance to see new equipment before it reaches building sites and to talk directly with manufacturers. We also described our co-ownership project to L’Installateur there.

Three men posing on the Panasonic stand at Interclima 2026, next to a large grey Big Aquarea T-CAP M Series heat pump
On the Panasonic stand at Interclima 2026: Thierry Ronat (centre), Country Manager France of Panasonic Heating & Cooling, with the Hecker & Frères Énergie team in front of the Big Aquarea T-CAP M Series. Photo: L’Installateur.

What Panasonic presented

According to L’Installateur, Panasonic made announcements from homes to offices and shops (the commercial sector):

  • Aquarea N Series: a future heat pump made in Europe, due early 2027, using R454C refrigerant with a GWP of 148. GWP (global warming potential) measures a gas’s climate effect compared with CO₂: the lower, the better if it leaks.
  • Aquarea EcoFlex: air and water heating, cooling and DHW (domestic hot water) around one outdoor unit. See our EcoFlex article.
  • ECOi-W Aqua-G Evo: a commercial heat pump using R290 (propane, a natural refrigerant with a very low GWP), in three outputs from 60 to 100 kW, to be made in Tillières-sur-Avre, Normandy.
  • A revised residential air conditioning range, with built-in Wi-Fi and nanoe X air purification on almost all models.

The common thread: covering houses, apartment buildings and commercial buildings, with more reversible systems (heating in winter, cooling in summer). Panasonic also says R290 models already account for more than a third of its residential air-to-water heat pump sales.

The project: 19 studios in Lille

The Panasonic case study describes a 1920s residential building in Lille: 600 m² in total, 19 studios of 31 m², partly insulated. Heating and hot water came from a 134 kW oil boiler. Rising oil prices and a poor DPE (the French energy performance certificate, rated A to G, which can prevent letting) led the co-owners to change.

The solution: two heat pumps in cascade

We installed two 30 kW Panasonic Big Aquarea T-CAP M Series heat pumps, 60 kW in total, using R290. “In cascade” means the two machines work together: one runs in mild weather, both when it is cold.

Why 60 kW instead of 134 kW? The old boiler made hot water instantly through a plate heat exchanger, which needed a lot of power. With two storage tanks, hot water is prepared in advance and 60 kW is enough.

Two grey Panasonic Big Aquarea T-CAP heat pumps on supports in a narrow brick courtyard, in front of a car park entrance
The two 30 kW Big Aquarea T-CAP M Series units in the building’s courtyard. Photo: Panasonic.

Constraints

  • A narrow courtyard: compact machines were needed, in front of the car park entrance.
  • Pipes above the garage: the water pipes between heat pumps and boiler room run above the entrance, at a height that keeps vehicles passing safely.
  • No shutdown: work started in June 2026 without switching off the old system, so residents kept heating and hot water.

What was done

Three people over three weeks: removal of the old boiler room, heat pump installation, 42 mm pipework, a 400-litre low-loss header (a tank that separates the heat pump circuit from the radiator circuit so each has the right flow), hot-water tanks, pumps, valves, sensors, wiring and a complete control system. The cast-iron radiators were kept, with thermostatic heads added for room-by-room control.

Brick boiler room with two beige storage tanks and a blue hot-water cylinder
In the boiler room, the domestic hot-water storage tanks. Photo: Panasonic.

Key figures

ItemBeforeAfter
Heat production134 kW oil boiler2 × 30 kW Big Aquarea T-CAP M Series (60 kW)
EnergyHeating oilElectricity, heat pumps using R290 (propane, natural refrigerant)
Domestic hot waterInstant, plate heat exchanger760 L storage
RadiatorsCast ironCast iron kept + thermostatic heads
Building1920s, 600 m², 19 studios of 31 m²
Works3 weeks, 3 people, from June 2026

The Big Aquarea T-CAP M Series is designed for apartment buildings and renovation: cascades up to 300 kW and flow water up to 75 °C depending on configuration. Thanks to Panasonic’s T-CAP technology, they run down to −28 °C outside and keep their output without electric backup down to −20 °C.

Figures taken on 2 November 2026 from the Panasonic case study.

Which co-ownership buildings does this suit?

  • Central oil or gas heating, with a shared boiler room that also makes hot water.
  • Water radiators, even old cast-iron ones: the M Series can deliver water up to 75 °C depending on configuration.
  • A DPE rating that blocks letting or a rising fuel bill.
  • Some outdoor space, even narrow (courtyard, flat roof), for the machines.

Before any quote, we calculate the building’s real needs, and the work must be voted at the general meeting. Steps, grants and heat metering are on our co-ownership heating page; heat pump types on our heat pump page.

This project in the press

The same project was covered by La Voix du Nord on 30 October 2026: see our article on the La Voix du Nord report. L’Installateur also announces a more detailed article in a coming issue.

Is your building thinking of replacing its boiler? Ask for a free study.

Free quote

A heating project for your building?

Boiler room visit, needs calculation and free study across the Lille area.

Frequently asked questions

What is the Interclima show?

A professional trade show in Paris dedicated to heating, air conditioning, ventilation and hot water, where manufacturers present new products.

Why can 60 kW of heat pumps replace a 134 kW boiler?

The boiler made hot water instantly, which needed a lot of power. With two storage tanks, hot water is prepared in advance: according to Panasonic, 60 kW covers heating and hot water for the 19 studios.

Can cast-iron radiators be kept?

Yes, on this project they were kept, with thermostatic heads added. Each case must be checked.

What is R290?

Propane used as a refrigerant: a natural fluid with a very low climate impact if it leaks.

Were residents left without heating during the works?

No. The work was done without switching off the old system.